# Qwen Harness Adapters: Compare the Same Tasks Before Claiming a Gain

> Evaluate a Qwen harness adapter with paired task outcomes, explicit missing runs, and separate reporting of accuracy and tool use.

Canonical article: https://modelrovia.com/guides/qwen-harness-adapter-paired-evaluation/
Author: Modelrovia Editorial
Published: 2026-11-26
Updated: 2026-11-26

## Key takeaway

Keep task identity and harness settings fixed, then inspect new successes and regressions separately.

Hugging Face's November 20 harness-adapter work studies Qwen3.8-27B inside different coding-agent harnesses. Its practical implication is to evaluate the **model, adapter and harness together**, keeping task IDs and settings fixed. An adapter’s reported improvement in one setup gives you a candidate to test on your own work. [Hugging Face research write-up](https://huggingface.co/blog/harness-adapters-at-scale)

## Pair the outcomes by task ID

Aggregate pass rates can hide which capabilities were lost. Keep every scheduled task in the run ledger and compare the same tasks in both configurations. Separate success, failure and missing execution before calculating results.

~~~python
base = {"A": True, "B": False, "C": True, "D": False}
adapted = {"A": True, "B": True, "C": False}
shared = sorted(base.keys() & adapted.keys())
missing = sorted(base.keys() - adapted.keys())
new_wins = [k for k in shared if not base[k] and adapted[k]]
regressions = [k for k in shared if base[k] and not adapted[k]]
print("shared:", shared)
print("missing adapted:", missing)
print("new wins:", new_wins)
print("regressions:", regressions)
print("paired passes:", sum(base[k] for k in shared),
      sum(adapted[k] for k in shared))
~~~

This authored fixture prints three paired tasks, one missing adapted run, one new win and one regression. Both configurations pass two of the three paired tasks. A report that only celebrates task B would overlook the loss on C and the absent run on D.

Investigate why D is missing. If the run hit your declared timeout, record a timeout outcome. If infrastructure never started it, report that separately and rerun the missing pair before claiming an overall result. Do not silently compare different task sets.

## Hold the surrounding system constant

Record the exact base and adapter revisions, merge configuration, harness version, tool definitions, thinking setting, token ceiling, time limit and concurrency. Reset the workspace for each attempt and use the same grader. The [grader-control tutorial](/guides/agent-evaluation-verifier-controls/) shows how to check known correct and wrong artifacts before a model comparison.

Once correctness is measured, inspect resource use on tasks both configurations solve. Report tool calls and generated tokens separately from wall-clock time. Fewer tool calls can coexist with longer model calls, more retries or higher per-token prices. Keep unsuccessful attempts in the total-cost calculation.

For a fictional paired set, suppose the base consumes 90 tool calls and the adapter consumes 60 on tasks both solve. The reduction is 33.3%. If the adapter also loses a critical task elsewhere, that efficiency result alone cannot decide the rollout. Review the regression trace and retain the base configuration until the acceptance criteria are met.

**Verification on November 26.** We executed the task-pairing example and checked the tool-call arithmetic. We did not train, merge or run a Qwen adapter. The synthetic fixture demonstrates reporting behavior.

## Sources & references

- [Hugging Face: Harness adapters and paired evaluations, November 20](https://huggingface.co/blog/harness-adapters-at-scale)

[Editorial standards](https://modelrovia.com/methodology/)
